Cost Effective Solutions


Cost-Effective Solutions

Transource® is focused on delivering solutions that minimize costs while maximizing the realized benefits of new transmission projects through its access to the outstanding transmission planning resources of its members.

Our planners have experience with projects from 23-kV up to 765-kV, including high voltage direct current (HVDC). Their capabilities include traditional reliability analysis using the latest tools, economic and production simulations, and voltage/transient stability and additional advanced technical analyses